Georgian
Court University
Wellness
Center Construction
Welcome. Thank you for
visiting the images from the construction of the
Georgian Court University Wellness Center.
Once an event is available for
viewing, the TITLE will change from
RED to GREEN.
When you click on an event, a page of pictures will appear. You see
more images by using the direction arrows at the top and bottom of the page.
If you see a picture you want a better look at, click on the image itself
and it will enlarge so that you can see just that image.
If you have any
problems finding a picture, please contact us: allissharp@aol.com
|
Panorama Images
Aerial Images of the University and the
construction work
|
Day to Day
Construction
-
Groundbreaking
-
21
April 2007
Services in the
ground
-
5
May 2007
Digging the
pond
-
17
May 2007
Drainage
system installation
-
23
May 2007
Building
Service Plumbing
-
9
June 2007
Building
drains and footing, Playing Field utilities installation
-
21
June 2007
Track Edges and building footing installations
-
6
- 9 July 2007
Concrete Forms
Athletic fields and Track preparation
Concrete pouring and finishing
-
1
- 9 August 2007
Landscaping and Turf
Hanging Iron
Paving the Track
-
17
August 2007
Iron
and Concrete Work
-
24
August 2007
Iron,
Fence, and the Pond
-
30-31
August 2007
Welding,
roof decking, paving Tennis Courts, sod
-
14
September 2007
Topcoating
Track, exterior framing, seeding grass
-
19
Sept - 1 Oct 2007
Sealcoating
Tennis Courts, colorcoating Track,concrete pour Gym Floor,
colorcoating ans striping Tennis Courts, install precast columns
-
2
Oct - 22 Oct 2007
Roofing,
top surface Track, more concrete, exterior walls, interior walls,
plumbing, wiring, duct work, Stucco, Lines & Numbers on Track
-
31
Oct - 1 Nov 2007
Exterior
Walls, utilities installation, window frames, front facade steel
arrives, raising field grade level
-
2
- 11 Nov 2007
Pump
station install, interior walls, insulation, drywall, utilities, wood
and waterproof roofing, start window installation, exterior stucco,
roadway to fields, facade steel completion
-
12
- 30 Nov 2007
Window
installation, drywall, stucco, roofing
-
3
- 10 Dec 2007
Radiant
heat and concrete in the entranceway, removal of old softball fields,
air-handling units onto the roof
-
11
- 31 Dec 2007
Roofing, stucco, drywall, air-handling unit start-up, epoxy floors
-
1
- 30 Jan 2008
Installation
of the Cowl Wall, drywall, lighting, bathroom tile, finishing track
features.
|
If you are interested in
purchasing a reprint, click on the ORDER button under the picture, and
then click on the ORDER
box at the bottom of the page. Fill in
the blanks, and the system will automatically send me an email
order. A credit card # is required. Your reprints will come by mail within 10 days. Digital
image downloads will come to your email address. They will be
4" x 6" @ 350dpi. You will be asked to confirm receiving
digital images. |